-
Posts
419 -
Joined
-
Last visited
Content Type
Profiles
Downloads
Forums
Store
Support
DOWNLOADS EXTRA
Services
Everything posted by 8o8 Designs
-
Green Doors Power and above ground trains
8o8 Designs replied to Kieran Lambert's Support Request in Support
1 bradley is a vanilla spawn and thats why it was the only one when you didnt have the rust edit extention ddl file installed. once its installed, all IO electricity will function and the other 2 custom bradleys spawn where they should. isla of man and ireland main road. the automated workcarts plugin should work perfectly. you have to installed this plugin and the data files provided for the plugin. -
Changed Status from Pending to Closed Changed Fixed In to Next Version
-
Thanks The red door is probably colliding with something and that's forcing it to close. The timer is default. I will check it out on RE. The water should be an easy fix. I'll extend the water trigger. I still need to add BetterNPC bots to Vault 808. Some of the air drops at Cobalt Harbour are just decoration. The only real drop is hanging on the crane.
-
Can you screenshot the area for me please?
-
Thanks for the report. I will have a look when I'm on RustEdit next and get it sorted for the next update
-
Hello The extra data & config files are for optional plugins (free and premium). You don't have to use them, but it will save you time IF you owned/used these plugins. The only one I would advise using is the free plugin 'Automated Workcarts' and use my data file. This will create an automated rail network with stops at various locations.