Jump to content

Resource Leveling - OPEN BETA 1.2.0

   (0 reviews)

4 Screenshots

  • 3.2k
  • 56
  • 20.57 kB
 Share

About Resource Leveling - OPEN BETA

Resource Leveling - BETA 1.2.0

The Resource Leveling plugin introduces an advanced leveling system for gathering various resources in Rust. Players can earn XP and improve their skills in different categories as they gather materials, hunt animals, and loot containers. Each category offers a unique way to earn XP, and as players level up, they receive more resources or additional benefits.

This plugin automatically replaces traditional 2x/3x/4x/5x/6x/7x/8x/9x/10x multipliers, as the progression system dynamically adjusts the gathering rates based on the player's level, making the experience more immersive and rewarding over time.

Features:

  • Multi-category Leveling System:
    • Mining: Gather stones, metal, and sulfur to earn XP. As you level up, you’ll receive more resources per hit.
    • Woodcutting: Chop down trees to collect wood and gain XP. Higher levels grant you more wood per swing.
    • Gathering: Collect resources like mushrooms, stones, and sulfur. Level up to gather more resources.
    • Hunting: Earn XP by killing animals and harvesting their meat and other products. Each level increases the amount of resources gathered.
    • Looting: Gain XP by opening crates and barrels. Once opened, a container will only give XP once, preventing abuse.
  • XP System: Players earn XP based on their activities in each category. The XP required to level up increases as players progress, ensuring a challenging progression system.
  • HUD Integration: Players can enable a HUD to track their progress in each resource category. The HUD displays the current level, the amount of XP, and the XP needed for the next level.
  • Automatic Activity Detection: The plugin automatically detects when a player gathers a resource, kills an animal, or opens a container, and awards XP based on the action performed.
  • Unique Looting Mechanic: The system remembers which containers players have opened, preventing the same container from being repeatedly used to farm XP.
  • Customizable XP: Server owners can now fully customize the XP values for each activity, allowing for complete control over player progression and the server's unique gameplay experience.

Installation and Use:

  1. Place the plugin in your server's oxide/plugins folder.
  2. Use the /showhud command to toggle the Resource HUD on or off.
  3. Customize XP settings through the configuration file to match your server's needs. (Config File: ResourceLeveling.json)
  4. Start gathering resources, hunting animals, and opening containers to earn XP and level up your skills.

This plugin adds an extra layer of depth and motivation for players by rewarding them for performing everyday activities in Rust. Try the BETA 1.0.0 (FREE) version today and share your feedback!

  • Like 1

User Feedback

1.4m

Downloads

Total number of downloads.

6.8k

Customers

Total customers served.

101.1k

Files Sold

Total number of files sold.

2m

Payments Processed

Total payments processed.

×
×
  • Create New...

Important Information

We have placed cookies on your device to help make this website better. You can adjust your cookie settings, otherwise we'll assume you're okay to continue.